3D Animation & Motion Graphics

OCBC Milestones Motion Graphics

 
Video production Singapore 2d signage animation ocbc

OCBC installs vertical signage. Is vertical the new 16:9?

OCBC Bank installs plasma signboards in its branch in NEX Serangoon. Is vertical the new 16:9? We shall keep our eyes out as more digital signs are being installed 9:16, requiring more aspect ratio conversions and content development for the new format in digital signage.

Milestones in life is turned from a collection of photos re arranged in 3d space to create depth in this animated 3d signboard.

 

 
Video Clip  

Client: OCBC
System Integrator: ESCO Audio Visual
3D Animation & Post: Motion Media Works
Language: English
Video Duration: 60s

 

Get the Flash Player to see this player.

Other 3d and Motion Graphics Productions

  • Starhub Online Graphics
  • Starwood Hotels and Resorts Stop Motion Animation
  • Fibre Network 3D Animation
  • Motion Graphics Animation m1 1box
  • M1 mFix Motion Graphics
  • M1 Next Generation NBN Motion Graphics
  • OCBC Milestones Motion Graphics
  • M1 Long Term Evolution Motion Graphics Video
  • M1 Multi-SIM Motion Graphics
  • Artivision
  • Business Objects - “High Performance”
  • SMS 2.0
  • M1 Retail Outlet Videos
  • Pacific Armies Management Seminar
  • Shark Energy Drink
  •  
    Company Info | Work with Us | Check us out on flickr | Buy Our Photos at Getty Images
    Website designed and maintained by Motion Media Works
    Copyright © 2008 Motion Media Works All Rights Reserved.
    No part(s) may be reproduced without written permission from respective owners.